Project Details
Work Type: Resurfacing
Phase: Design
Length: 4.139 miles
City:
County:
Road:
Design Cost: $1 Million
Letting: 12/03/2024
Estimated Costs
Construction Cost: $9.3 Million
About

The purpose of this project is to repave Pineda Causeway (State Road (S.R.) 404) from U.S. 1 to S.R. A1A in Merritt Island. The paving would also include the interchange ramps at U.S. 1, County Road (C.R.) 3 (South Tropical Trail), and S.R. 513 (S. Patrick Drive). The project also plans to add wrong way detection on the ramps that don’t already have the technology, add bike lanes next to the right turn lane (keyhole lane) at the S.R. A1A intersection; and update pavement markings for the bike lanes.

Contact Information
Design Project Manager
Gene Varano
(386) 943-5145
Gene.Varano@dot.state.fl.us
Design Firm
Dewberry Engineers, Inc.