Project Details
Work Type: Resurfacing
Phase: Construction
Length: 4.139 miles
City:
County:
Road:
Construction Cost: $10.7 million
Project Start: Summer 2025
Est. Completion: Early 2026
About

The Florida Department of Transportation (FDOT) is resurfacing Pineda Causeway (State Road (S.R.) 404) from U.S. 1 (S.R. 5) to S.R. A1A on Merritt Island. The project limits include the interchange ramps at U.S. 1, County Road (C.R.) 3 (South Tropical Trail), and S.R. 513 (South Patrick Drive).


The project also includes several operational enhancements, such as reconstructing the existing traffic signal at the intersection of S.R. 404 and S.R. A1A with new mast arm poles.


Additional improvements include installing wrong-way detection systems on ramps that currently lack them, adding bike lanes adjacent to the right turn lane at the S.R. A1A intersection, and updating the pavement markings for the bike lanes.

Contact Information
Communications Team
Ashley Ingham
(321) 634-6111
Ashley.Ingham@dot.state.fl.us
Lane Closures
  • There are no lane closures at this time.