Work Type: Safety Project
Phase: Construction
Length: 0.061 miles
City:
County:
Road:
Construction Cost: $1.1 Million
Project Start: Early 2026
Est. Completion: Summer 2026
About

The purpose of this project is to improve pedestrian safety by constructing a signalized crossing at the intersection of International Speedway Boulevard (U.S. 92/State Road (S.R.) 600) and Lockhart Street in Daytona Beach. These improvements include installing a new signalized pedestrian crossing,equipped with Accessible Pedestrian Signals (APS). APS are devices that use audible sounds and spoken messages surfaces to let blind or lowvision pedestrians know when it is safe to cross a street. In addition, pedestrian curb ramps throughout the project area will be upgraded to meet current Americans with Disabilities Act (ADA) standards.

Contact Information
Communications Team
Debbie Cople
(386) 740-3566
Debbie.Cople@dot.state.fl.us
Contractor
Signal Technology and Installation Corp.
Lane Closures
  • Monday, April 6 to Friday, April 10 from 10 p.m. to 8 a.m.: Motorists can expect outside single lane closures on eastbound International Speedway Boulevard (U.S. 92) from South Adams Street to Lincoln Street for drilled shaft operations.

    Access may be limited for certain driveways along the project corridor. The contractor will be coordinating driveway work with each affected property owner.

    FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!