447698-1 S.R. 600 at the intersection of Lockhart Street
Project Details
| Work Type: | Safety Project |
|---|---|
| Phase: | Construction |
| Length: | 0.061 miles |
| City: | |
| County: | |
| Road: | |
| Construction Cost: | $1.1 Million |
About
The purpose of this project is to improve pedestrian safety by constructing a signalized crossing at the intersection of International Speedway Boulevard (U.S. 92/State Road (S.R.) 600) and Lockhart Street in Daytona Beach. These improvements include installing a new signalized pedestrian crossing,equipped with Accessible Pedestrian Signals (APS). APS are devices that use audible sounds and spoken messages surfaces to let blind or lowvision pedestrians know when it is safe to cross a street. In addition, pedestrian curb ramps throughout the project area will be upgraded to meet current Americans with Disabilities Act (ADA) standards.
Contact Information
Lane Closures
-
Monday, March 30 to Friday, April 3 from 10 p.m. to 8 a.m.: Motorists can expect outside single lane closures on westbound and eastbound International Speedway Boulevard (U.S. 92) from South Adams Street to Lincoln Street for sidewalk work.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!