Project Details
Work Type: Safety Project
Phase: Construction
Length: 0.061 miles
City:
County:
Road:
Construction Cost: $1.1 Million
Project Start: Early 2026
Est. Completion: Summer 2026
About

The purpose of this project is to improve pedestrian safety by constructing a signalized crossing at the intersection of International Speedway Boulevard (U.S. 92/State Road (S.R.) 600) and Lockhart Street in Daytona Beach. These improvements include installing a new signalized pedestrian crossing,equipped with Accessible Pedestrian Signals (APS). APS are devices that use audible sounds and spoken messages surfaces to let blind or lowvision pedestrians know when it is safe to cross a street. In addition, pedestrian curb ramps throughout the project area will be upgraded to meet current Americans with Disabilities Act (ADA) standards.

Contact Information
Contractor
Signal Technology and Installation Corp.
Communications Team
Christine Batchelder
(386) 740-3564
Christine.Batchelder@dot.state.fl.us
Lane Closures
  • Sunday, May 31 through Thursday, June 4 from 10 p.m. to 8 a.m.: Motorists can expect outside single lane closures on eastbound and westbound South Adams Street to Lincoln Street for sidewalk, driveway, curb and gutter, and concrete work.  

    Access may be limited for certain driveways along the project corridor. The contractor will be coordinating driveway work with each affected property owner.

    FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!