447106-2 SR 526 from Mills Ave to Maguire Blvd/Crystal Lake Dr
Project Details
Estimated Costs
Construction Cost: | $6 Million |
---|
About
The purpose of this project is to make corridor improvements along Robinson Street (State Road (S.R.) 526) from Mills Avenue (S.R. 15) to Maguire Boulevard/North Crystal Lake Drive in Orlando to enhance safety and efficiency.
The project will make changes to the roadway configuration to encourage slower speeds and improve accommodations for pedestrians. The corridor will have one travel lane in each direction, separated by a center two-way left turn lane between Mills Avenue and Hampton Avenue. Raised medians with openings for left turns will be constructed between Hampton Avenue and Festival Way. The entire corridor will be repaved.
On-street parking areas will be provided on westbound Robinson Street between Altaloma Avenue and Hampton Avenue. There will be some on-street parking on eastbound Robinson Street near Primrose Drive and near Festival Way.
Contact Information
Design Project Manager |
---|
Joseph Fontanelli
(386) 943-5234
Joseph.Fontanelli@dot.state.fl.us
|
Design Firm |
Greenman-Pedersen, Inc. (GPI Southeast, Inc.)
|