Project Details
Work Type: Resurfacing
Phase: Construction
Length: 6.508 miles
City:
County:
Road:
Construction Cost: $8.5 Million
Project Start: Fall 2023
Est. Completion: Summer 2024
About

The Florida Department of Transportation (FDOT) is milling and resurfacing U.S. 192 (State Road 500 / East Irlo Bronson Memorial Highway) from Hibiscus Road to the Osceola/Brevard County line. The purpose of this 6.5-mile project is to extend the service life of the existing roadway and incorporate improvements that will enhance the safety of the corridor.

Contact Information
Communications Team
Max Longbottom
(321) 634-6111
Max.Longbottom@dot.state.fl.us
Contractor
OHLA USA, Inc.
Lane Closures
  • Sunday, March 31, to Saturday, April 6, from 7 a.m. to 7 p.m.,

    Motorists can expect a single outside lane closure eastbound on S.R. 500/ U.S 192 between Hibiscus Road and the Brevard County Line.

    These closures are needed for paving operations.

    Please proceed with caution in construction zones.

  • Sunday, March 24, to Saturday, March 30, from 7 a.m. to 7 p.m.,

    Motorists can expect a single outside lane closure westbound on S.R. 500/ U.S 192 between Hibiscus Road and the Brevard County Line.

    These closures are needed for paving operations.

    Please proceed with caution in construction zones.