Project Details
Work Type: Resurfacing
Phase: Design
Length: 5.302 miles
City:
County:
Road:
Design Cost: $1.8 Million
Letting: 01/31/2024
Estimated Costs
Construction Cost: $17.7 Million
About

The project will resurface this segment of U.S. 192 to extend the life of the existing roadway. The project also will widen the existing bicycle lane to a 6-foot-wide buffered bicycle lane in each direction to improve safety for bicyclists. Other operational improvements include extending left turn lanes, reconstructing some existing median and corner curbs, and upgrades to traffic signals. 

Pedestrian safety enhancements include adding new pedestrian crossings at the I-95 interchange, as well as new and upgraded crosswalks throughout the project limits. The project also will reconstruct pedestrian curb ramps to current Americans with Disabilities Act (ADA) standards and upgrade pedestrian signals. Drainage and lighting improvements are also planned.

A public information meeting about this project was held August 16, 2022. Please see the public meeting information in the files below.

 