Project Details
Work Type: Traffic Signal Maintenance
Phase: Design
Length: 0.021 miles
City:
County:
Road:
Design Cost: $856,000
Letting: 11/07/2023
Estimated Costs
Construction Cost: $412,000
About

The purpose of the project is to reconstruct the existing traffic signal at the intersection of State Road (S.R.) 15 and Mount Vernon Street. Proposed improvements include the replacement of the existing diagonal span signal with two dual mast arm signal poles. The project also includes drainage pipe reconstruction, and Americans with Disabilities Act (ADA) and lighting system upgrades. 

A public meeting for this project was held on August 24, 2022. Please see the public meeting information in the files below.

Contact Information
Design Firm
Connect Engineering, LLC
Design Project Manager
Stefan Levine
386-943-5394
Stefan.Levine@dot.state.fl.us