Project Details
Work Type: Safety Project
Phase: Design
County:
Road:
Letting: 05/20/2020
Estimated Costs
Construction Cost: $2.7 Million
About
The purpose of this project is to install wrong-way driving countermeasures on off-ramps at the following Interstate 4 interchanges: Central Florida Parkway (Exit 71), Sand Lake Road (State Road 482) (Exit 74A), Lake Mary Boulevard (Exit 98), County Road 46A (Exit 101A), S.R. 46 (Exit 101B), Orange Boulevard/U.S. 17-92 (Exit 104), Dirksen Drive (Exit 108), and Saxon Boulevard (Exit 111A/B).

Countermeasures include additional signing and pavement markings, flashing beacons, and installing connections to the regional traffic management center (RTMC) communications system to help alert emergency responders.

Contact Information
Design Firm
Traffic Engineering Data Solutions, Inc
Design Project Manager
Su Hao
(386) 943-5161
Su.Hao@dot.state.fl.us