Project Details
Work Type: Safety Project
Phase: Construction
Length: 2.522 miles
City:
County:
Road:
Construction Cost: $16.8 Million
Project Start: Spring 2024
Est. Completion: Summer 2025
About

This Florida Department of Transportation (FDOT) project is intended to enhance safety and operations along the corridor of (State Road) S.R. 50 (Colonial Drive) between Pine Hills Road and Tampa Avenue. The project will improve crosswalk conditions and install new signal improvements.

Additionally, the project will modify several existing median openings along the corridor to improve safety and operations.

To learn more about Pedestrian Hybrid Beacons (PHB), including how to use them:

Pedestrian Hybrid Beacon Video 

How to Use a PHB

Contact Information
Communications Team
Annabelle Bruzos Vega
(321) 319-8130
Annabelle.BruzosVega@dot.state.fl.us
For Media Inquiries Only
FDOT-D5Comm@dot.state.fl.us
Lane Closures
  • Sunday, October 26, through Friday, October 31, from 9 a.m. to 6 p.m.: Motorists should expect eastbound intermittent inside and outside single lane closures on S.R. 50 from Pine Hills Road to Tampa Avenue for traffic separator installation. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.

  • Sunday, October 26, through Friday, October 31, from 7 a.m. to 4 p.m.: Motorists should expect westbound intermittent inside and outside single closures on S.R. 50 from Pine Hills Road to Tampa Avenue for traffic separator installation. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.

  • Sunday, October 19, through Friday, October 24, from 7 a.m. to 4 p.m.: Motorists should expect westbound intermittent outside single and double lane closures on S.R. 50 from Pine Hills Road to Tampa Avenue for traffic separator installation. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.

  • Sunday, October 19, through Friday, October 24, from 7 a.m. to 4 p.m.:  Motorists should expect eastbound intermittent single and double lane closures on S.R. 50 from Pine Hills Road to Tampa Avenue for traffic separator installation. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.