Project Details
Work Type: Resurfacing
Phase: Construction
Length: 3.792 miles
City:
County:
Road:
Construction Cost: $5.4 Million
Project Start: Fall 2023
Est. Completion: Summer 2024
About

The purpose of this project is to repave State Road (S.R.) 44 from N. Hill Avenue to the eastbound Interstate 4 (I-4) on ramp, with the exception of the proposed limits of a new roundabout at the S.R. 44 intersection with Kepler Road. The roundabout will be constructed under a separate design-build project, (FPID No. 431922-1) scheduled to begin in summer 2024.

Improvements also include safety and operational upgrades such as correcting slopes at two curves and upgrading the guardrail at the I-4 overpass. Pedestrian safety improvements include enhanced intersection lighting, upgraded pedestrian signals, and reconstructed sidewalk curb ramps to meet current Americans with Disabilities Act (ADA) standards.

Contact Information
Communications Team
Britney Jones
(386) 740-3566
Britney.Jones@dot.state.fl.us
Contractor
P&S Paving, Inc.
Lane Closures
  • There are no lane closures at this time.