Project Details
Work Type: Milling and Resurfacing
Phase: Design
Length: 3.792 miles
City:
County:
Road:
Letting: 07/05/2022
Estimated Costs
Construction Cost: $4.3 Million
About

This project will repave State Road (S.R.) 44 from N. Hill Avenue to the eastbound Interstate 4 (I-4) on ramp, with the exception of the proposed limits of a new roundabout at the S.R. 44 intersection with Kepler Road. The roundabout is being designed under FPID number 431922-1 and is not yet funded for construction. 

This project also proposes safety and operational upgrades that include providing wider shoulders to create bicycle lanes through the I-4 overpass, correcting slopes at two curves, and upgrading the guardrail at the I-4 overpass. Pedestrian safety improvements are planned, including enhanced intersection lighting, upgraded pedestrian signals, and reconstructed sidewalk curb ramps to meet current Americans with Disabilities Act (ADA) standards.

Contact Information
Design Project Manager
Ty Garner
(386) 943-5299
ty.garner@dot.state.fl.us
Design Firm
Burgess and Niple, Inc