Project Details
Work Type: Resurfacing
Phase: Design
Length: 1.747 miles
County:
Road:
Design Cost: $1.9 Million
Letting: 06/12/2024
Estimated Costs
Construction Cost: $11.9 Million
About

This project intends to resurface State Road (S.R.) 535 from north of U.S. 192 to south of International Drive and implement operational and safety improvements along the corridor. 

The intersection at Poinciana Boulevard will also be modified to allow traffic on S.R. 535 to turn right or go straight through the intersection. S.R. 535 traffic desiring to turn left onto the side street would go through the intersection, make a U-turn and then turn right onto the side street. Traffic from the side streets can go straight through the intersection or turn right or left onto S.R. 535.

Other safety improvements such as curb reconstruction to shorten pedestrian crossing distances, and turn lane and traffic signal upgrades, are planned at Kyngs Heath Road, Osceola Parkway eastbound onramp, Poinciana Boulevard and LBV Factory Stores Drive. The project will add a third left turn lane from southbound S.R. 535 onto eastbound U.S. 192. Pedestrian crosswalks and upgrade pedestrian signals, as well as enhance lighting at signalized intersections, are also planned.

Contact Information
Design Project Manager
Kevin Powell
(386) 943-5425
Kevin.Powell@dot.state.fl.us
Design Firm
Dewberry Engineers, Inc.