Project Details
Work Type: Resurfacing
Phase: Design
Length: 2.896 miles
City:
County:
Road:
Design Cost: $655,000
Letting: 08/02/2022
Estimated Costs
Construction Cost: $2.3 Million
About

The project will repave U.S. 301 from County Road (C.R.) 521 to State Road (S.R.) 44 between the cities of Coleman and Wildwood to extend the life of the existing roadway. Safety enhancements include adding asphalt to help prevent depressions or grooves in the road at several locations where the side road or driveway is unpaved. The project also will widen the asphalt shoulder through the interchange with Florida’s Turnpike to increase the separation between the travel lanes and barrier wall.

Contact Information
Design Project Manager
Daniel Simpson
(386) 943-5394
Daniel.Simpson@dot.state.fl.us
Design Firm
Tetra Tech, Inc.
Project Files