Project Details
Work Type: Safety Project
Phase: Design
Length: 1.188 miles
City:
County:
Road:
Letting: 07/28/2021
Estimated Costs
Construction Cost: $2.1 Million
About
The purpose of the project is to remove the existing two-way left turn lane and construct a raised median on Citrus Boulevard (U.S. 27/U.S. 441) to improve safety on the corridor.
Contact Information
Design Project Manager
Samuel Jumber
(386) 943-5244
samuel.jumber@dot.state.fl.us
Design Firm
AIM Engineering and Surveying, Inc.
(813) 627-4144