442881-1 SR 518 from US 1 to Pineapple Avenue
Project Details
Estimated Costs
Construction Cost: | $1.3 Million |
---|
About
The purpose of this project is to extend the life of the existing roadway by repaving Montreal Avenue from U.S. 1 to Pineapple Avenue and improve pedestrian and bicycle safety along the corridor. Proposed design elements include adding landscaped curb extensions, removing six on-street parking spaces from the outside right lane, adding 11 on-street-parking spaces to the inside left lane, adding a 7-foot-wide buffered bike lane, and modifying existing sidewalks.
Contact Information
Design Project Manager |
---|
Kathleen Enot
(386) 943-5149
kathleen.enot@dot.state.fl.us
|
Design Firm |
GAI Consultants Southeast, Inc
|