This project has been completed and is only available for historical reference.
Project Details
Work Type: Lighting
Phase: Completed
Length: 18.585 miles
City:
County:
Road:
About

The goal of this project is to increase pedestrian safety at specific signalized intersections by installing street lighting that offers better visibility. Light Emitting Diode (LED) fixtures will be installed at each intersection, and any existing fixtures will be upgraded to LED.  No other intersection improvements are expected in this project. This project improves signalized intersections along Grove Street (State Road (S.R.) 19), Citrus Blvd (U.S. 27), U.S. 27, and S.R. 46 at the following locations:

1. Grove Street at C.R. 44/Orange Avenue
2. Citrus Boulevard at Hill Street
3. Citrus Boulevard at Griffin Road
4. Citrus Boulevard at Bealls Plaza
5. Citrus Boulevard Picciola Road
6. Citrus Boulevard at Dr. M L King Jr Boulevard
7. U.S. 27 at Cagan Crossing Boulevard
8. U.S. 27 at Woodcrest Way
9. U.S. 27 at Glenbrook Boulevard
10. U.S. 27 at Golden Eagle Boulevard
11. U.S. 27 at Hartwood Marsh Road
12. U.S. 27 at Citrus Tower Boulevard
13. U.S. 27 at Johns Lake Road
14. U.S. 27 at Steves Road
15. U.S. 27 at Hooks Street
16. U.S. 27 at Washington Street
17. U.S. 27 at South. Breeze Drive/Minneola Shores
18. S.R. 46 at C.R 437/Hunter Avenue


FDOT has completed the design phase of this project.  Local utility companies are completing the required work.