Project Details
Work Type: Lighting
Phase: Design
Length: 1.917 miles
City:
County:
Road:
Letting: 02/02/2021
Estimated Costs
Construction Cost: $146,000
About

The goal of this project is to increase pedestrian safety at specific signalized intersections by installing street lighting that offers better visibility. Light Emitting Diode (LED) fixtures will be installed at each intersection, and any existing fixtures will be upgraded to LED.  No other intersection improvements are expected in this project. This project improves signalized intersections along State Road 500-600 (Orange Blossom Trail) at the following locations:

  • LaQuinta Drive
  • Morning Drive/Sunlife Path
  • August Lane/Florida Mall
  • Skyview Drive/Southland Boulevard
Contact Information
Design Project Manager
Heidi Trivett
(386) 943-5466
Heidi.Trivett@dot.state.fl.us
Design Firm
SRD, Inc.