430202-8 SR A1A from Long Point Road to George King Blvd
Project Details
Work Type: | Safety Project |
---|---|
Phase: | Design |
Length: | 1.038 miles |
City: | |
County: | |
Road: |
Estimated Costs
ROW Cost: | $5 million |
---|---|
Construction Cost: | $14.3 million |
About
This project is within the City of Cape Canaveral and intends to reconstruct State Road (S.R.) A1A from Long Point Road to George King Boulevard to create a corridor that safely accommodates vehicles, pedestrians, and bicyclists. FDOT has worked closely with residents and the City of Cape Canaveral to develop a preferred option for design.
The planned roadway would provide two 10-foot-wide travel lanes in each direction separated by a raised median. Median openings and improved left turn lanes will be provided. A wider 9-foot-wide sidewalk is planned on both sides to accommodate pedestrians and bicyclists.
Contact Information
Design Project Manager |
---|
Lori Trebitz
(386) 943-5538
Lori.Trebitz@dot.state.fl.us
|