409870-1 SR 44 (CR 44B) from US 441 to SR 44
Project Details
Estimated Costs
| Construction Cost: | $42 Million | 
|---|
About
The project consists of reconstructing and widening State Road (S.R.) 44 (County Road 44B) from U.S. 441 to S.R. 44. The proposed concept would provide two 11-foot-wide travel lanes in each direction separated by a median. An improved, closed drainage system, as well as bicycle lanes and sidewalks along both sides of the corridor, are included.
This project is not yet funded for construction.
Contact Information
| Design Firm | 
|---|
| 
							
                               AECOM Consult, Inc.								
 | 
                        
| Design Project Manager | 
| 
							
                               Ryan Frazier								
 (386) 943-5591 
                                                                        Ryan.Frazier@dot.state.fl.us
																		
									
                             |