EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Widening
Phase: Design
Length: 2.092 miles
City:
County:
Road:
Estimated Costs
ROW Cost: $975,000
Construction Cost: $26.5 Million
About
The project consists of reconstructing the existing two-lane roadway facility with drainage ditches to a divided four-lane roadway facility with a closed drainage system. The road will consist of two, 11-foot-wide travel lanes in each direction. There will be bicycle lanes and sidewalks along both sides of the roadway. The median will be 19.5 feet in width.
Contact Information
Design Firm
AECOM Consult, Inc.
Design Project Manager
Todd Long
(386) 943-5558
todd.long@dot.state.fl.us
Project Files