Project Details
Work Type: Widening
Phase: Design
Length: 2.113 miles
County:
Road:
Letting: 07/07/2021
Estimated Costs
ROW Cost: $2.5 Million
Construction Cost: $18.4 Million
About

State Road 434 (Forest City Road) is proposed to be widened to six lanes. One lane in each direction will be added to the median. Three existing stormwater ponds will be expanded. Median openings will be modified. No additional signals are planned. The east curb line will be reconstructed, the west curb line stays in place. 4-foot-wide bike lanes are included.

Contact Information
Design Firm
Stantec Consulting Services, Inc
(407) 823-8966
Design Project Manager
Eliode Joseph
(386) 943-5388