Project Details
Work Type: Widening
Phase: Construction
Length: 4.157 miles
City:
County:
Road:
Construction Cost: $44.95 Million
Project Start: Summer 2020
Est. Completion: Late 2023
About
This is a project to widen U.S. 441/U.S. 27/State Road (S.R.) 500 from four to six lanes between Lake Ella Road and Avenida Central. Both northbound and southbound U.S. 441 will be expanded from two to three lanes, and bicycle lanes and sidewalks will be added along the length of the project. The FDOT will also do drainage work, add signage, make lighting upgrades, make median access changes and improve the aesthetics of the roadway with new landscaping.

A key aspect of the project will be the removal of U.S. 441 bridges over County Road (C.R.) 25, and the creation of a new, at-grade intersection at that location. C.R. 25 will connect with U.S. 441 on the east side of the highway via a signalized intersection but will end as a cul-de-sac on the west side of U.S. 441. 

Contact Information
Contractor
Southland Construction, Inc.
(407) 889-9844
Communications Team
Tom McNiff
(352) 620-3020
thomas.mcniff@dot.state.fl.us
Lane Closures
  • Sunday, Oct. 18 - Friday, Oct. 30: Watch for lane closures between 8 p.m. and 7 a.m. nightly between West Hermosa Street and Old Vineyard for paving operations along the median. One lane of traffic will remain open during closures for the traveling public. Please slow down and exercise caution in the construction zone.