EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Central Florida Roads

Florida Department of Transportation

Project Details
Work Type: Widening
Phase: Construction
Length: 1.185 miles
City:
County:
Road:
Project Start: Fall 2017
Est. Completion: Fall 2020
About
The project includes an at-grade intersection at U.S. 441 and State Road (S.R.) 46, with a grade separated flyover from southbound U.S. 441 to eastbound S.R. 46. The project also includes the reconstruction of S.R. 46 into a six-lane divided controlled access roadway.

The proposed roadway typical section of S.R.46 is a six-lane urban arterial. This section would provide a 22-foot raised median, three travel lanes in each direction, buffered bike lanes, curb and gutter, and 5-foot sidewalks.

For the most up-to-date information and status on this project log onto http://wekivaparkway.com/project-3b.php

Contact Information
Communications Team
Nick Lulli
(407) 710-5610
info@wekivaparkway.com
Contractor
GLF Construction Corporation
(407) 888-8481
Lane Closures
Project Files