-
Monday, July 14 to Saturday, July 19, from 7:30 a.m. to 5 p.m.: Motorists can expect intermittent inside single lane closures on westbound and eastbound U.S. 92 from the Halifax River Bridge to State Road (S.R.) A1A for irrigation, large plant installation, and lateral line installation.
No expected detours at this time.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Monday, July 7 to Saturday, July 12, from 7:30 a.m. to 5 p.m.: Motorists can expect intermittent inside single lane closures on westbound and eastbound U.S. 92 from the Halifax River Bridge to State Road (S.R.) A1A for irrigation, large plant installation, and lateral line installation.
No expected detours at this time.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Sunday, July 13 to Thursday, July 17, from 7 p.m. to 6 a.m. the following morning: Motorists can expect single lane closures on northbound and southbound U.S. 17-92 from Wisconsin Avenue to north of S.R. 15A (Taylor Road) for permanent signage installation, signalization work, and striping operations.
There are no expected detours at this time.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Sunday, July 6 to Thursday, July 10, from 7 p.m. to 6 a.m. the following morning: Motorists can expect single lane closures on northbound and southbound U.S. 17-92 from Wisconsin Avenue to north of S.R. 15A (Taylor Road) for permanent signage installation, signalization work, and striping operations.
There are no expected detours at this time.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!