- 
		
		
		
		Monday, November 3rd through Friday, November 7th from 6:30 a.m to 5:30 p.m.: Motorists should expect intermittent westbound outside single lane closures on Clarcona Ocoee Road from Lake Sparkling Road to Walmart’s Driveway for sidewalk work. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy. 
- 
		
		
		
		Monday, November 3rd through Friday, November 7th from 6:30 a.m. to 5:30 p.m.: Motorists should expect intermittent westbound outside single lane closures on Clarcona Ocoee Road from Long Lake Drive to North Powers Drive for sidewalk work. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy. 
- 
		
		
		
		Monday, November 3rd through Friday, November 7th from 6:30 a.m. to 5:30 p.m.: Motorists should expect intermittent southbound outside single lane closures on North Pine Hills Road from Clarcona Ocoee Road to Energy Air Court for sidewalk work. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy. 
- 
		
		
		
		Sunday, October 26 to Thursday, October 30, from 9 p.m. to 7 a.m. the following morning: Motorists can expect alternating double-lane closures in the northbound and southbound inside and outside lanes on S.R. 434, between S.R. 436 and Vineridge Run. These closures are necessary for crews to safely perform friction course paving. FDOT encourages all roadway users to drive, walk and ride with caution and courtesy! 
 FDOT Emergency Travel Alert: For information on the current situation, please visit the following
            page -
            FDOT Emergency Travel Alert: For information on the current situation, please visit the following
            page -  
