-
Daytime on Sunday, September 14, through Friday, September 19, from 7 a.m. to 7 p.m.: Motorists should expect overnight rotating right and left lane closures as needed on southbound and northbound as State Road (S.R.) 19, for signal work and landscaping.
Note: The Florida Department of Transportation, on behalf of the contractor, is asking residents not to park along Bay and Grove streets after 8 p.m. for several weeks so that parking paving can continue unobstructed. The contractor has installed electronic message boards asking that residents steer clear of parking along this route after 8 p.m. Before 8 p.m., the contractor will also use cones to block off parking areas each evening to designate which spaces will be paved overnight.
FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!
*Lane closures are subject to change due to unforeseen events and weather.
-
Overnight on Sunday, September 14, through Friday, September 20, from 9 p.m. to 8 a.m.: Motorists should expect overnight rotating right and left lane closures on northbound State Road (S.R.) 19 (Grove Street), for paving, signal pole installation, and signal work.
Note: The Florida Department of Transportation, on behalf of the contractor, is requesting that residents refrain from parking along Bay and Grove streets after 8 p.m. for several weeks to ensure that parking paving can proceed unobstructed. The contractor has electronic message boards installed asking that residents steer clear of parking along this route after 8 p.m. Before 8 p.m., the contractor will also use cones to block off parking areas each evening to designate which spaces will be paved overnight.
FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!
*Lane closures are subject to change due to unforeseen events and weather.