Monday, January 12 to Thursday, January 15, from 8 p.m. to 6 a.m. the following morning: Motorists can expect alternating single lane closures in the inside, outside, and turn lanes in both directions on S.R. 434, between Slade Drive and N. Ronald Reagan Boulevard. These closures are necessary for crews to safely perform signal loop installation.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!