437398-2 US 92/ISB Beachside
About
This study was built upon the previous prepared U.S. 92 Corridor Master Management Plan. This study included a comprehensive evaluation of the corridor and determined a context sensitive preferred alternative. Extensive coordination was conducted with local and regional agency partners as well as the public and local communities to determine the recommended alternative.
Recommendations associated with the preferred alternative are currently unfunded. For information related to the design phase, please follow path: http://www.cflroads.com/project/437942-1/US_92_SR_600_from_the_Halifax_River_Bridge_to_SR_A1A