450644-1 Nova Road (S.R. 5A) from Flomich Street to U.S. 1
Project Details
Work Type: | Resurfacing |
---|---|
Phase: | Design |
Length: | 3.91 miles |
City: | |
County: | |
Road: | |
Design Cost: | $2.2 million |
Letting: | 01/28/2026 |
Estimated Costs
Construction Cost: | $10.4 million |
---|
About
The Florida Department of Transportation (FDOT) plans to mill and resurface nearly 4 miles of Nova Road (State Road (S.R.) 5A) from Flomich Street north to U.S.1. The project also proposes safety and operational improvements from Granada Boulevard (S.R. 40) to Wilmette Street developed during the corridor planning project. The purpose of the planning project was to identify safety opportunities and evaluate potential solutions.
The preferred concept recommended two travel lanes in each direction from north of Granada Boulevard to Wilmette Street with a raised landscaped median, wider sidewalks, and additional signalized pedestrian crossings. Improved turn lanes would be provided at median openings to facilitate left turns and U-turns. The project is also proposing a new traffic signal at Old Kings Road. The roadway configuration south of Granada Boulevard would not change.
Contact Information
Design Project Manager |
---|
Gene Varano
(386) 943-5145