EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Resurfacing
Phase: Design
Length: 1.188 miles
City:
County:
Road:
Design Cost: $2.1 Million
Letting: 06/04/2024
Estimated Costs
Construction Cost: $6 Million
About

The purpose of this project is to make corridor improvements along Robinson Street (State Road (S.R.) 526) from Mills Avenue (S.R. 15) to Maguire Boulevard/North Crystal Lake Drive in Orlando to enhance safety and efficiency.

The project will make changes to the roadway configuration to encourage slower speeds and improve accommodations for pedestrians. The corridor will have one travel lane in each direction, separated by a center two-way left turn lane between Mills Avenue and Hampton Avenue. Raised medians with openings for left turns will be constructed between Hampton Avenue and Festival Way. The entire corridor will be repaved.

On-street parking areas will be provided on westbound Robinson Street between Altaloma Avenue and Hampton Avenue. There will be some on-street parking on eastbound Robinson Street near Primrose Drive and near Festival Way.  

 

Contact Information
Design Firm
Greenman-Pedersen, Inc. (GPI Southeast, Inc.)
Design Project Manager
Derek Dean
(386) 943-5161
Derek.Dean@dot.state.fl.us
Project Files