Project Details
Work Type: Safety Project
Phase: Completed
Length: 4.322 miles
City:
County:
Road:
Construction Cost: $3.9 Million
Project Start: Spring 2024
Est. Completion: Summer 2025
About

The Florida Department of Transportation (FDOT) is enhancing pedestrian safety along State Road (S.R.) A1A from Crescent Beach Drive to south of Minutemen Causeway. In this area, S.R. A1A is split; northbound S.R. A1A is known as South Atlantic Avenue, and southbound S.R. A1A is known as South Orlando Avenue.

Safety upgrades are planned at six northbound and southbound pedestrian crossings. These crossings are located at South First Street, South Fourth Street, South Eighth Street, South 13th Street, South 16th Street, and 21st Street (Summer Street).

The improvements include 10 In-Roadway Warning Lights (IRWLs) and two Pedestrian Hybrid Beacons (PHBs). In addition, pedestrian curb ramps will be reconstructed to meet current Americans with Disabilities Act (ADA) standards. 

Northbound S.R. A1A (S. Atlantic Avenue) Crosswalk Features and Locations

  • S. 21st St. -IRWL 
  • S. 16th St. -IRWL
  • S. 13th St.- IRWL
  • S. 8th St. -  IRWL
  • S. 4th St.-   IRWL
  • 1st St. S.-   PHB

Southbound S.R. A1A (S. Orange Avenue) Crosswalk Features and Locations

  • 1st St. S.-   PHB 
  • S. 4th St.-   IRWL
  • S. 8th St. -  IRWL
  • S. 13th St.- IRWL
  • S. 16th St. -IRWL
  • S. 21st St. -IRWL

 

Contact Information
Contractor
Carr Construction, LLC
Communications Team
Ashley Ingham
(321) 634-6111
Ashley.Ingham@dot.state.fl.us
Goes With
Project Files
Project Images
PHB - Drivers, see this? Do This!
PHB - Pedestrians, see this? Do This!