445691-2 SR 527 at Clay Ave Roundabout
Project Details
Estimated Costs
Construction Cost: | $2.8 Million |
---|
About
The purpose of the project is to provide crash reduction countermeasures at the intersection of Orange Avenue (State Road (S.R.) 527) and Clay Avenue in Orlando. The project is based on recommendation of the “Corridor Safety Study” on S.R. 527 from Clay Avenue to South Orlando Avenue (U.S. 17/92). This project is not yet programmed for construction.
Contact Information
Design Project Manager |
---|
Joseph Fontanelli
(386) 943-5735
Joseph.Fontanelli@dot.state.fl.us
|
Design Firm |
BCC Engineering, LLC
|