Project Details
Work Type: Resurfacing
Phase: Construction
Length: 2.852 miles
City:
County:
Road:
Construction Cost: $10.6 Million
Project Start: Spring 2024
Est. Completion: Fall 2025
About

The Florida Department of Transportation (FDOT) is resurfacing Woodland Boulevard (U.S. 17-92/
State Road (S.R.) 15/600) from Wisconsin Avenue in Orange City to north of Taylor Road (S.R.
15A) in DeLand to extend the life of the existing roadway.

In addition to repaving the travel lanes, the project will upgrade pedestrian curb ramps and existing crosswalks. This project will also modify the existing drainage system to accommodate the proposed sidewalk, signal and roadway work.

Contact Information
Communications Team
Debbie Cople
(386) 740-3566
Debbie.Cople@dot.state.fl.us
Contractor
P&S Paving, Inc.
Lane Closures
  • Friday, November 1 through Friday November 8, from 7 p.m. to 6 a.m., motorists can expect outside single and double lane closures northbound and southbound from Orange Camp Road and continuing south to work on asphalt milling and paving operations.

    No expected detours at this time.

  • Sunday, October 27 through Friday November 1, from 7 p.m. to 6 a.m., motorists can expect outside single lane closures northbound from State Road (S.R.) 472 to Orange Camp Road to work on asphalt widening.

    No expected detours at this time.