This project has been completed and is only available for historical reference.
Project Details
Phase: Completed
Length: 0.2 miles
City:
County:
Road:
Construction Cost: $3 Million
Project Start: Spring 2023
Est. Completion: Early 2024
About

The Florida Department of Transportation (FDOT) will rebuild the existing signal at the intersection of Semoran Boulevard (State Road (S.R.) 436) and Curry Ford Road (S.R. 552) In addition, the project includes modifying the existing right turn lanes at the intersection, improving drainage, and resurfacing the roadway within the project limits. This includes adding and upgrading the traffic control devices. The upgraded traffic signal system will have new vehicle detection capabilities, accessible pedestrian signals, and signal heads which will provide increased contrast for better visibility. Additionally, a raised crosswalk will be installed in the Eastbound right turn lane where Curry Ford Road (S.R. 552) intersects with Semoran Boulevard (S.R. 436). The purpose of this project is to improve traffic operations and safety along State Road's (S.R.) 436 & 552. 

Contact Information
Communications Team
Peyton Reese
(321) 319-8130
Peyton.Reese@dot.state.fl.us
Contractor
Chinchor Electric, Inc.