Project Details
Work Type: Resurfacing
Phase: Completed
Length: 0.316 miles
City:
County:
Road:
Construction Cost: $1.6 Million
Project Start: Late 2022
Est. Completion: Summer 2023
About

The purpose of this project is to extend the life of the existing roadway by repaving Montreal Avenue from U.S. 1 to Pineapple Avenue and improve pedestrian and bicycle safety along the corridor.  Proposed design elements include adding landscaped curb extensions, removing six on-street parking spaces from the outside right lane, adding 11 on-street-parking spaces to the inside left lane, adding a 7-foot-wide buffered bike lane, and modifying existing sidewalks.

Contact Information
Communications Team
Max Longbottom
(321) 634-6111
Max.Longbottom@dot.state.fl.us
Contractor
OHLA USA, Inc.