Project Details
Work Type: Resurfacing
Phase: Construction
Length: 0.997 miles
City:
County:
Road:
Construction Cost: $4.7 Million
Project Start: Early 2024
Est. Completion: Late 2024
About

The purpose of this job is to resurface South Orange Avenue (State Road 527) from Grant Street to Gore Street. In addition to repaving the roadway, the project plans to extend curb lines in certain areas to better define on-street parking and improve sight lines for traffic turning onto Orange Avenue from side streets. Short, raised traffic separators are also planned within the existing center two-way left turn lane at four locations: south of Lake Beauty Drive, south of Copeland Drive, near Underwood Street and north of Annie Street. Improved crosswalks and new pedestrian lighting is also planned, along with decorative sidewalk and crosswalk features in conjunction with the Pulse Memorial.

Contact Information
Communications Team
Peyton Reese
(321) 319-8130
Peyton.Reese@dot.state.fl.us
Lane Closures
  • Sunday, March 31, through Thursday, April 25, from 12:00 a.m. to 11:59 p.m.: Weather permitting, motorists can expect Eastbound and Westbound Miller Street at the Eastside intersection of South Orange Avenue to temporarily close for the installation of new drainage pipes and structures. Drivers can still access Miller Street and South Orange Avenue by following posted detour signs.

  • Sunday, March 31, through Thursday, April 25, from 12:00 a.m. to 11:59 p.m.: Weather permitting, motorists can expect Eastbound and Westbound Wysteria Avenue at the Eastside intersection of South Orange Avenue to temporarily close for the installation of new drainage pipes and structures. Drivers can still access Wysteria Avenue and South Orange Avenue by following posted detour signs.