The goal of this project is to increase pedestrian safety at specific signalized intersections by installing street lighting that offers better visibility. Light Emitting Diode (LED) fixtures will be installed at each intersection, and any existing fixtures will be upgraded to LED.  No other intersection improvements are expected in this project. This project improves signalized intersections along Grove Street (State Road (S.R.) 19), Citrus Blvd (U.S. 27), U.S. 27, and S.R. 46 at the following locations: Grove Street at C.R. 44/Orange Avenue
  1. Citrus Boulevard at Hill Street
  2. Citrus Boulevard at Griffin Road
  3. Citrus Boulevard at Bealls Plaza
  4. Citrus Boulevard Picciola Road
  5. Citrus Boulevard at Dr. M L King Jr Boulevard
  6. U.S. 27 at Cagan Crossing Boulevard
  7. U.S. 27 at Woodcrest Way
  8. U.S. 27 at Glenbrook Boulevard
  9. U.S. 27 at Golden Eagle Boulevard
  10. U.S. 27 at Hartwood Marsh Road
  11. U.S. 27 at Citrus Tower Boulevard
  12. U.S. 27 at Johns Lake Road
  13. U.S. 27 at Steves Road
  14. U.S. 27 at Hooks Street
  15. U.S. 27 at Washington Street
  16. U.S. 27 at South. Breeze Drive/Minneola Shores
  17. S.R. 46 at C.R 437/Hunter Avenue

FDOT performed the design portion of this project.  The construction will be completed by Duke Energy and Leesburg Electric.

Lane Closures
No lane closures anticipated