Project Details
Work Type: Lighting
Phase: Construction
Length: 18.585 miles
City:
County:
Road:
About
The goal of this project is to increase pedestrian safety at specific signalized intersections by installing street lighting that offers better visibility. Light Emitting Diode (LED) fixtures will be installed at each intersection, and any existing fixtures will be upgraded to LED.  No other intersection improvements are expected in this project. This project improves signalized intersections along Grove Street (State Road (S.R.) 19), Citrus Blvd (U.S. 27), U.S. 27, and S.R. 46 at the following locations:

1. Grove Street at C.R. 44/Orange Avenue
2. Citrus Boulevard at Hill Street
3. Citrus Boulevard at Griffin Road
4. Citrus Boulevard at Bealls Plaza
5. Citrus Boulevard Picciola Road
6. Citrus Boulevard at Dr. M L King Jr Boulevard
7. U.S. 27 at Cagan Crossing Boulevard
8. U.S. 27 at Woodcrest Way
9. U.S. 27 at Glenbrook Boulevard
10. U.S. 27 at Golden Eagle Boulevard
11. U.S. 27 at Hartwood Marsh Road
12. U.S. 27 at Citrus Tower Boulevard
13. U.S. 27 at Johns Lake Road
14. U.S. 27 at Steves Road
15. U.S. 27 at Hooks Street
16. U.S. 27 at Washington Street
17. U.S. 27 at South. Breeze Drive/Minneola Shores
18. S.R. 46 at C.R 437/Hunter Avenue

FDOT performed the design portion of this project.  The construction will be completed by Duke Energy and Leesburg Electric.
Contact Information
Communications Team
Thomas McNiff
(352) 620-3020
Thomas.McNiff@dot.state.fl.us
Lane Closures
  • There are no lane closures at this time.