Project Details
Work Type: Lighting
Phase: Construction
Length: 14.841 miles
City:
County:
Road:
Construction Cost: $890,521
Project Start: Spring 2020
Est. Completion: Early 2021
About
The goal of this project is to increase pedestrian safety at specific signalized intersections by installing street lighting that offers better visibility. Light Emitting Diode (LED) fixtures will be installed at each intersection, and any existing fixtures will be upgraded to LED.  No other intersection improvements are expected in this project. This project improves signalized intersections along U.S. 192, Main Street (U.S. 17-92), and Vine Street (U.S. 192) at the following locations:
  • U.S. 192 at Orange Lake Boulevard
  • U.S. 192 at the S.R. 429 northbound and southbound ramps
  • U.S. 192 at Orange Lake Boulevard/Rolling Oaks Boulevard
  • U.S. 192 at Black Lake Road
  • U.S. 192 at Formosa Gardens Boulevard
  • U.S. 192 at Entry Point Boulevard
  • U.S. 192 at Old Lake Wilson Road
  • U.S. 192 at Reedy Creek Boulevard
  • U.S. 192 at Celebration Place/Parkway Boulevard
  • U.S. 192 at Arabian Nights Boulevard
  • U.S. 192 at Celebration Avenue
  • U.S. 192 at International Drive
  • U.S. 192 at Holiday Trail
  • U.S. 192 at Seralago Boulevard
  • U.S. 192 at Polynesian Isles Boulevard
  • U.S. 192 at Poinciana Boulevard
  • U.S. 192 at State Road (S.R.) 535
  • U.S. 192 at Super Target
  • U.S. 192 at Seven Dwarfs Lane
  • U.S. 192 at Siesta Lago Drive
  • U.S. 192 at Old Vineland Road
  • U.S. 192 at Hoagland Boulevard
  • U.S. 192 at Armstrong Boulevard
  • U.S. 192 at Dyer Boulevard
  • U.S. 192 at Orange Avenue
  • U.S. 192 at Thacker Avenue
  • U.S. 192 at Emory Avenue
  • U.S. 192 at John Young Parkway
  • U.S. 192 at Central Avenue
  • Main Street (U.S. 17-92) at U.S. 192/Vine Street
  • Vine St (U.S. 192) at Oak Street/Michigan Avenue   
  • Contact Information
    Contractor
    PowerCore, Inc.
    (321) 984-2374
    Communications Team
    Shemir Wiles
    (321) 319-8130
    Shemir.Wiles@dot.state.fl.us
    Lane Closures
    • There are no lane closures at this time.