439864-1 St. Johns River-to-Sea Loop Myrtle Ave. from 10th St. to SR 44
Project Details
Phase: | Design |
---|---|
Length: | 1.229 miles |
City: | |
County: | |
Road: | |
Design Cost: | $1 Million |
Letting: | 02/06/2024 |
Estimated Costs
ROW Cost: | $526,000 |
---|---|
Construction Cost: | $3.7 Million |
About
This project proposes to construct a nearly 1.2-mile-long multi-use trail along Myrtle Avenue from 10th Street to State Road (S.R.) 44 in New Smyrna Beach. The trail is a segment of the St. Johns River-to-Sea Loop.
The goal of the project is to enhance pedestrian and bicyclist safety in the area as well as provide a vital connection through New Smyrna Beach between the City of Edgewater and the East Coast Greenway Trail.
Contact Information
Design Firm |
---|
Newkirk Engineering, Inc.
|
Design Project Manager |
Gene Varano
(386) 943-5145