EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Skip to Content
About
Study Extents: SR 524 from Friday Road West of I-95 to Industry road;

Project Length: 3.15 miles; Project Schedule: 18 months;

SR 524 is a two-lane, urban minor arterial, with four foot paved shoulders and open swale drainage within approximately 200 feet of right-of-way. Limited bicycle pedestrian features are present and a sidewalk is located on the north side of the roadway from Cox Road to Industry Road. This project has been requested by the Space Coast Transportation Planning Organization (SCTPO) to coordinate the development of a future vision for the SR 524 corridor that establishes a multi-modal approach to providing for future transportation needs. This study will involve a community-based evaluation to determine how best to meet the needs of current and future users and to establish a long-term plan to guide evolution of the corridor that appropriately correlates the balance between land use and transportation planning.

Project Files