EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Skip to Content
About

The corridor planning and concept development studies are designed to evaluate multi-modal transportation improvements along a 4.2 mile section of SR 519 between the Barnes Boulevard/I-95 northbound ramps and SR 520 in Brevard County, Florida.  The corridor is located within both the Cities of Rockledge and Cocoa, and is a primary north-south route between Viera, I-95 and SR 520; serving local traffic as well as many visitors. 

 

The initial Planning Study, completed October 2016, seeked to address the safety and mobility needs of the community (for vehicle, transit, bicycle and pedestrian transportation modes) and advanced the long term vision for the corridor, based on the input received by the public, as well as the local agency partners.

 

The Concept Development is the next step in collecting necessary information to develop, and compare those alternatives derived in the Planning Study, select a preferred alternative(s), and prepare the concept for implementation.

 

PS = files from previous Planning Study

Project Files