EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Skip to Content
About

The project begins 1,218’ south of SR 40 on SR 500 (US 441) and extends northward for 1969’ stretching between SW 3rd Street to NW 2nd Street.  The intent of the project is to implement traffic operation improvements and improve the life of the pavement through milling and resurfacing the existing travel lanes, and the additional of turn lane widening.  Minor drainage, pedestrian, sidewalk, intersection and signalization improvements are also a part of this project. The proposed improvements will add a dual left turn on NB SR 500 onto SR 40, and extend the left turn queue length of the SB left turn on SR 500 onto SR 40 and the NB left turn on SR 500 onto NW 2nd Street.