EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Skip to Content
About
The improvements on this project include milling and resurfacing of the travel lanes of S.R. 5A (Nova Road) from S.R. 400 (Beville Road) to U.S. 92 (International Speedway Boulevard). The project also includes curb ramp and pedestrian signal improvements, sidewalk repair and guardrail installation.
Lane Closures
  • Sunday, August 13th, 2017 to Saturday, August 19th, 2017

    Monday - Wednesday, 1 a.m. - 5 p.m., short, intermittent outside lane closures possible between S.R. 400/Beville Road and U.S. 92/International Speedway Boulevard to accommodate concrete trucks for sidewalk work.

    Pedestrian detours: Pedestrians are advised of possible sidewalk closures in various locations along S.R. 5A/Nova Road between International Speedway Boulevard and Beville Road for sidewalk and curb work. Signs will direct pedestrians around the construction.