This project has been completed and is only available for historical reference.
About
This project has multiple segments, with each segment handled under a different contract.  The current projects are 427986-1-72-15 and 427986-1-72-20.

Work included on project #427986-1-20 includes drainage improvements along S.R. 483 (Clyde Morris Boulevard) from S.R. 400 (Beville Road) to U.S. 92 (International Speedway Boulevard) in Daytona Beach. The improvements include drainage repair, ditch cleaning and reshaping, installation of a new headwall, and the installation of a synthetic turf revetment system.

Work included on project #427986-1-15 includes cleaning and lining of storm pipe along State Road (S.R.) 400 (Beville Road) from Woodcrest Drive to U.S. 1. Other locations include: U.S. 1 at S. Palmetto Avenue, East Fox Place, White Place and Bayshore Drive; 3002 S. Peninsula Drive; Ora Street and S.R. 442 at U.S. 1.

 

 

 

 

Project Files