EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Skip to Content
About
The project consists of reconstructing the existing two-lane roadway facility with drainage ditches to a divided four-lane roadway facility with a closed drainage system. The road will consist of two, eleven-foot travel lanes in each direction. There will be bicycle lanes and sidewalks along both sides of the roadway. The median will be 19.5 feet in width.
Project Files