This project involves widening Interstate 95 (I-95) from four-lanes to six-lanes from north of State Road (S.R.) 44 to north of U.S. 92 (International Speedway Boulevard). The southern project limit will tie into the recently completed I-95 widening project to the south (from south of S.R. 406 to north of S.R. 44).  The project scope also includes the reconstruction of the systems interchange with I-4, I-95 and U.S. 92.

Work to be done includes pavement widening, drainage systems improvements, bridge widening, bridge replacement, retaining walls, highway lighting, Intelligent Transportation System (ITS) modifications, median barriers, signing and pavement markings, signalization, milling, and resurfacing.

This project reconstructs the I-95 interchange leading to and from I-4 and U.S. 92, which will increase mobility and connectivity. It will also increase safety for merging, exiting and through-traffic. The project will eliminate a left-side merge ramp onto I-95 from U.S. 92, just a short distance to the south. Additional lanes will be constructed along I-95 allowing vehicles traveling through the area to continue in dedicated lanes, and vehicles entering and exiting I-95 to be separated into dedicated entrance and exit lanes.

Lane Closures
  • Sunday, March 19th, 2017 to Saturday, March 25th, 2017

    Monday - Friday, 9 p.m. - 7 a.m., I-95 northbound and southbound inside lane closure between S.R. 421 and Spruce Creek.

    Monday - Friday, 7 a.m. - 6 p.m., I-95 southbound inside lane closure from north of U.S. 92 to U.S. 92 for hauling embankment material.

    Monday, 9 p.m. - 6 a.m., I-95 southbound inside lane closure north of U.S. 92 for deck pour.

    Thursday, 9 p.m. - 6 a.m., I-95 southbound to U.S. 92 ramp closed for paving operations. I-95 southbound traffic will be directed to exit at Exit 265 and follow LPGA Boulevard south to U.S. 92.

    Wednesday - Thursday, 9 p.m. - 6 a.m., I-4 eastbound and westbound lane closures near the I-95 interchange for paving operations.

    Wednesday - Friday, 9 p.m. - 6 a.m., I-95 northbound outside lane closure from south of I-4 to north of I-4 for setting barrier wall.

    Saturday, 9 p.m. - 6 a.m., 9 p.m. - 6 a.m., I-95 southbound outside lane closure south of Spruce Creek for bridge demolition.

    Traffic Shift Monday, March 20, 9 p.m. - 6 a.m., I-95 southbound from north of the S.R. 421 interchange to S.R. 44 to shift traffic to the final alignment over S.R. 421 and Spruce Creek. (Tuesday, March 21, is the backup date for the switch if needed)

    Traffic Shift Tuesday, March 21, 9 p.m. - 6 a.m., I-95 northbound traffic will shift from south of I-4 to just north of I-4, requiring a single lane closure for the shift. (Wednesday, March 22, is the backup date if needed)

  • Sunday, March 26th, 2017 to Saturday, April 1st, 2017

    Sunday - Friday, 9 p.m. - 7 a.m., I-95 southbound outside lane closure from S.R. 421 to south of Spruce Creek for bridge demolition.

    Sunday - Friday, 9 p.m. - 7 a.m., I-95 northbound inside lane closure from S.R. 421 to Spruce Creek.

    Monday - Friday, 7 a.m. - 7 p.m. and 9 p.m. - 6 a.m., I-95 southbound inside lane closure north of U.S. 92 to south of U.S. 92.

    Monday - Friday, 9 p.m. - 6 a.m., I-95 northbound outside lane closure from south of I-4 to north of I-4 for setting barrier wall.

    Traffic Shift Monday, March 27, 9 p.m. - 6 a.m., I-95 northbound traffic will shift from south of I-4 to just north of I-4, requiring a single lane closure for the shift.