Project Details
Work Type: Widening
Phase: Design
Length: 7.64 miles
County:
Road:
Design Cost: $3.6 Million
Estimated Costs
Construction Cost: $44 Million
About

The project plans to widen State Road (S.R.) 40 from the existing two lanes to four lanes from S.R. 11 to Cone Road. The length of the project is approximately 7.1 miles.

The project includes resurfacing of the existing roadway to serve as westbound travel lanes and building new roadway for eastbound travel lanes. The project will also include a 12-foot-wide, paved, multi-use trail on the south side of the road.

The project also includes reconstructing the S.R. 11 intersection, replacing three existing bridges and adding a wildlife crossing box culvert (8' x 19'). Drainage modifications, stormwater treatment facilities, extension and/or replacement of existing culverts, and ditches and interceptor ditches are planned.

Contact Information
Design Firm
Inwood Consulting Engineers, Inc.
Design Project Manager
Kathleen Enot
(386) 943-5149