238275-8 CR 46A Realignment from SR 46 to North of Arundel Way (Section 5)
Website for Entire Project: http://wekivaparkway.com/
Project Details
Work Type: | Construction Work |
---|---|
Phase: | Completed |
Length: | 2.45 miles |
County: | |
Road: | |
Construction Cost: | $9.89 Million |
Project Start: | Spring 2017 |
Est. Completion: | Fall 2020 |
About
The project is to design the non-tolled relocation of County Road 46A out of the Seminole State Forest, thereby improving habitat connectivity and reducing the risk of conflicts between vehicles and wildlife. CR 46A would be realigned 2.5 miles from north of Arundel Way to connect to State Road 429 east of Camp Challenge Road.
A multi-use trail will be built along the SR 46 portion of this section. Work will include depressing the roadway and maintaining a vegetative buffer along a portion of the project to reduce visibility, drainage, lighting, sign and pavement markings, utilities and other roadway features.
For the most up-to-date information and status on this project log onto http://www.wekivaparkway.com/project-5.php