-
Sunday, April 28, through Saturday, May 4, from 7 a.m. to 5 p.m. and 9 p.m. to 6 a.m.: Motorists should expect daytime eastbound and westbound shoulder closures within the project limits for drainage, ditch grading, and sidewalk work. Additionally, overnight eastbound and westbound outside lane closures will be in effect for signal work. Please reduce your speed, alertly merge into the open lane and cautiously bypass the construction zone.
-
Sunday, April 14, through Saturday, April 27, from 7 a.m. to 5 p.m.: Motorists should expect daytime eastbound and westbound shoulder closures within the project limits for drainage, ditch grading, sidewalk work, and light pole installation. Please reduce your speed, alertly merge into the open lane and cautiously bypass the construction zone.