-
8:30 a.m. Monday, July 14, through 5:30 p.m. Friday, July 18
Motorists can expect intermittent inside and outside lane closures eastbound and westbound U.S. 192 (S.R. 500) from Brandywine Lane to Babcock Street.
These closures are needed for miscellaneous construction activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
8 p.m. Sunday, July 13, through 6 a.m. Thursday, July 17
Motorists can expect intermittent inside and outside lane closures eastbound and westbound U.S. 192 (S.R. 500) from Brandywine Lane to Babcock Street.
These closures are needed for miscellaneous construction activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Monday, July 21 through Friday, July 25 from 7 a.m. to 5 p.m.: Motorists can expect eastbound and westbound alternating shoulder closures on U.S. 191 from Target Boulevard to Lake Cecile Drive for earthwork and pedestrian signalization. Some driveways may experience temporary closures during work. FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy.
-
Monday, July 14 through Friday, July 18 from 7 a.m. to 5 p.m.: Motorists can expect eastbound shoulder closures on U.S. 191 from Sheffield Circle to Lake Cecile Drive for earthwork. Some driveways may experience temporary closures during work. FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy.