-
Monday, January 26 through Friday, January 30, from 8 a.m. to 5 p.m.: Motorists can expect a shoulder closure southbound I-95 at the off ramp to S.R. 46 (Exit 223). All exits will remain open at all times.
The ramp will be temporarily reduced to 11 ft wide for miscellaneous construction activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Monday, January 26 through Friday, January 30, from 8 a.m. to 5 p.m.: Motorists can expect inside lane closures southbound and northbound S.R. I-95 from S.R. 50 (Exit 215) to S.R. 46 (Exit 223).
These closures are needed for guardrail and ditch pavement work.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Sunday, January 25 through Thursday, January 29, from 7 p.m. to 7 a.m.: Motorists can expect inside single lane closures northbound S.R. I-95 from Palm Bay Road (Exit. 176) to Eau Gallie (Exit 183).
These closures are needed for paving activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Sunday, January 25 through Thursday, January 29, from 7 p.m. to 7 a.m.: Motorists can expect outside single lane closures southbound S.R. I-95 from north of Fiske to South of Fisk Blvd (Exit 195).
These closures are needed for paving activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!