-
Tuesday, November 18 through Friday, November 21 from 9 a.m. to 4 p.m.: Motorists should expect a road closure on U.S. 192 at Botanic Boulevard for drainage and sidewalk work. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy
Motorists will be detoured through Old Melbourne Highway to access Botanic Boulevard.
-
Monday, November 17 through Friday, November 21 from 9 a.m. to 4 p.m.: Motorists should expect intermittent westbound right lane closures on U.S. 192 from Nova Road to Arthur J Gallagher Boulevard for concrete and pipe work. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy